Installing the Click 340/341/342
Mount the managed switch on a DIN rail; to avoid contact resistance, only use clean, cor-
rosion-free DIN rails. Before mounting the modules, an end clamp should be mounted on
the le-hand side next to the managed switch to stop the modules from slipping on the
DIN rail. e end clamp should only be mounted on the right-hand side once the managed
switch has been mounted.
Follow the steps below to install the Click 340/341/342 onto the DIN rail (see Figure 1.4):
1 Place the module onto the DIN rail from above (A). e upper holding keyway must
be hooked onto the top edge of the DIN rail. Push the module from the front towards
the mounting surface (B).
Figure 1.4 – Attaching the Switch to the DIN rail
2 Once the module has been snapped on properly, check that it is xed securely on the
DIN rail. Ensure that the positive latches are facing upwards, i.e., snapped on correctly.
Removing the Device
Follow the steps below to remove the Click 340/341/342 from the DIN rail (see Figure 1.5):
1 Remove all connectors.
2 Pull down the positive latches using a suitable tool (e.g., screwdriver). Both positive
latches remain snapped out.